Skip to content

CSF Raise Open · from A$500Invest now →

Talbingo — Bendemeer, Northern Tablelands, NSW
Bendemeer, Northern Tablelands, NSW

Talbingo

Professional farm management, on behalf of Talben Pty Ltd

0hectares enrolled
0project
Stage Supplylifecycle position
NSWAustralia
Explore
Lifecycle positionStage 03Supply
Evaluate
Design
03
Supply
04
Operate
05
Audit
06
Invest
07
Buy
RAM Co (Rural Asset Management)·392.17 ha·Planning
Invest from A$500 →Join the Movement →
About This Property

Talbingo is a corporate-owned investor property held by Talben Pty Ltd and managed by RAM Co (Rural Asset Management) on behalf of Fresh Earth. These properties are professional regenerative land investments — not family farms.

One of the highest-yielding environmental plantings projects in our portfolio — modelled at 61 ACCUs per hectare per year, at 830 to 963 metres above sea level, next door to Glenclair.

The Land

Talbingo sits on 392 hectares of granite Northern Tablelands country, neighbouring the Glenclair Aggregation near Bendemeer. Acquired off-market as a deceased estate in September 2025, the property offers one of the highest ACCU yields in the Fresh Earth portfolio: 61.43 ACCUs per hectare per year across 277 hectares of Environmental Plantings. Tree planting is planned for Autumn and Spring 2026, sharing Glenclair's full operational infrastructure — machinery, contractors, staff, and housing — at zero additional marginal cost. Two wind turbines are proposed within the Bendemeer Wind Farm development, with option payments already received.

Baseline → Target

Measurement begins at baseline and tracks toward the project target across the property. All values are modelled or measured — not independently verified until Stage 05 audit.

EP Project Area0hatarget · planning stage
EP Yield (modelled)0ACCUs/ha/yrtarget · planning stage
Elevation830m ASLconfirmed
Rainfall750mm/yrconfirmed

Digital Twin

A 3D scan of the property — navigate the land, understand the terrain, see the operating context.

Talbingo Digital Twin

Carbon & Ecology Projects

Each project operates under a separate CER registration, with its own measurement baseline and audit pathway.

Revenue Timeline

Confirmed milestones are solid. Estimated future milestones are shown dashed — subject to regulatory decisions and operational scheduling.

First ACCUs issued~2028
Talbingo Environmental Plantings
Planting — Autumn 2026~Apr 2026
Talbingo Environmental Plantings
CER registeredFeb 2026
Talbingo Environmental Plantings
Property acquired (off-market deceased estate)Sep 2025
Talbingo Environmental Plantings
Planting — Spring 2026~Sep 2026
Talbingo Environmental Plantings

Where Talbingo sits in the chain.

Follow Talbingo's current position in the Fresh Earth verification chain — from property scoping through to independent audit and treasury recognition.

  1. 01

    One of the Highest-Yielding Properties

    Active

    Granite Northern Tablelands. 61.43 ACCUs/ha/yr — one of the highest yields modelled by the Fresh Earth team.

    Talbingo sits on 392 hectares of granite Northern Tablelands country neighbouring the Glenclair Aggregation near Bendemeer — acquired off-market as a deceased estate in September 2025. When the Fresh Earth team modelled the EP project area, the yield came back at 61.43 ACCUs per hectare per year across 277 hectares. That is one of the highest figures the team has modelled for any property in the portfolio. Elevation (830–963m ASL), rainfall (750–800mm/yr), and native vegetation remnants all contribute.

    Total area:
    392.17 ha
    EP project area:
    277 ha (FullCAM / PLANR modelled)
    Yield (modelled):
    61.43 ACCUs/ha/yr — highest modelled in portfolio
    ACCUs (25yr):
    422,672 projected
  2. 02

    CER Registration Complete

    Active

    Project registered February 2026. Planting operations Autumn and Spring 2026.

    Talbingo's Environmental Plantings project was registered with the Clean Energy Regulator in February 2026 (ERF-EP-2026-0205) under the Reforestation by Environmental or Mallee Plantings 2024 methodology. Planting operations are scheduled for Autumn and Spring 2026 — running in parallel with the Glenclair Aggregation, sharing its full operational infrastructure including machinery, contractors, staff, and housing at zero additional marginal cost.

    CER registration:
    ERF-EP-2026-0205 (Feb 2026)
    Methodology:
    Reforestation by Environmental or Mallee Plantings 2024 (PLANR)
    Planting — Autumn:
    Apr 2026 (planned)
    Shared infrastructure:
    Glenclair machinery, staff, contractors — zero marginal cost
  3. 03

    Dual Revenue Potential

    In progress

    Wind energy alongside carbon. DSA offtake confirmed. 2 turbines proposed in Bendemeer Wind Farm.

    Talbingo's carbon pathway is the primary project, but two wind turbines are proposed within the adjacent Bendemeer Wind Farm development — with option payments already received by the property. This mirrors the Hillview Park model: carbon project income diversified by a renewable energy income layer, reducing the dependence on any single credit market. Offtake of ACCUs has been confirmed with Decarbonisation Solutions Australia (DSA).

    ACCU offtake:
    Decarbonisation Solutions Australia (DSA) — confirmed
    Wind (proposed):
    2 turbines — Bendemeer Wind Farm (option payments received)
    Infrastructure sharing:
    Glenclair Aggregation — full shared ops system
    Verification gate:
    Stage 05 — independent CER audit before outcomes recognised

Back the platform that monitors this verification chain.

The CSF raise funds the platform that runs this verification chain across every property.

Back the platform behind Talbingo.

The CSF raise funds Fresh Earth Universe Pty Ltd — the operating system behind the measurement, audit, and treasury chain running across this and every farm in the portfolio.